Thermoelectric Power Plants
Intecho provides the market with a wide range of technical solutions in the area of steam use, ranging from preliminary feasibility studies and process optimization to the implementation of complete projects (turn key) for thermal power plants or cogeneration units, including:
- PRELIMINARY TECHNICAL EVALUATION STUDIES.
- THERMAL CYCLE STUDIES
- TECHNICAL AND ECONOMIC FEASIBILITY STUDIES.
- BASIC PROJECTS
- EXECUTIVE PROJECTS
- EQUIPMENT (*)
- INSTRUMENTATION
- AUTOMATION
- INTERCONNECTIONS
- MOUNTING
- ASSEMBLY, COMMISSIONING AND START-UP SUPERVISION
- TRAINING
- ASSISTED OPERATION
timber
01 Thermoelectric Power Plant – 7.1 mw with multi-stage steam turbine – model: M-70 – condensation with controlled extraction – Fuel: wood.
SCOPE OF SUPPLY:
- ENGINEERING OF THE SUPPLIED EQUIPMENT AND THEIR INTERCONNECTIONS;
- STEAM TURBINE;
- SPEED REDUCER;
- ELECTRIC GENERATOR;
- SURFACE CONDENSER;
- COOLING TOWER;
- SET OF ELECTRICAL CONTROL PANELS OF PLANT AND GENERATION EQUIPMENT;
- ASSEMBLY, COMMISSIONING, START-UP AND TRAINING SUPERVISION.
Elephant grass
01 Thermoelectric Power Plant – 5.5 mw with multi-stage steam turbine – model: M-70 – condensation with controlled extraction – Fuel: Capim Elefante.
SCOPE OF SUPPLY:
- ENGINEERING OF THE SUPPLIED EQUIPMENT AND THEIR INTERCONNECTIONS;
- STEAM TURBINE;
- SPEED REDUCER;
- ELECTRIC GENERATOR;
- SURFACE CONDENSER;
- WATER TREATMENT STATION;
- SET OF ELECTRICAL CONTROL PANELS OF PLANT AND GENERATION EQUIPMENT;
- ASSEMBLY, COMMISSIONING, START-UP AND TRAINING SUPERVISION.
rice husk
01 Thermoelectric Power Plant – 1.2 mw with multi-stage steam turbine – model: M-60 – pure condensation – Fuel: Rice Husk.
SCOPE OF SUPPLY:
- ENGINEERING OF THE SUPPLIED EQUIPMENT AND THEIR INTERCONNECTIONS;
- STEAM TURBINE;
- SPEED REDUCER;
- ELECTRIC GENERATOR;
- SURFACE CONDENSER;
- COOLING TOWER;
- ASSEMBLY, COMMISSIONING, START-UP AND TRAINING SUPERVISION.
Process gas
01 Thermoelectric Power Plant – 6.0 mw with multi-stage steam turbine – model: M-70 – pure condensation – Fuel: Process Gas.
SCOPE OF SUPPLY:
- ENGINEERING OF THE SUPPLIED EQUIPMENT AND THEIR INTERCONNECTIONS;
- STEAM TURBINE;
- SPEED REDUCER;
- ELECTRIC GENERATOR;
- SURFACE CONDENSER;
- SET OF ELECTRICAL CONTROL PANELS OF PLANT AND GENERATION EQUIPMENT;
- ASSEMBLY, COMMISSIONING, START-UP AND TRAINING SUPERVISION
Sugarcane Bagasse
01 Thermoelectric Power Plant – 10.0 mw with multi-stage steam turbine – model: M-70 – counter pressure – Fuel: Sugarcane Bagasse.
SCOPE OF SUPPLY:
- ENGINEERING OF THE SUPPLIED EQUIPMENT AND THEIR INTERCONNECTIONS;
- STEAM TURBINE ENGECROL;
- SPEED REDUCER;
- ELECTRIC GENERATOR;
- SET OF ELECTRICAL CONTROL PANELS OF PLANT AND GENERATION EQUIPMENT;
- ASSEMBLY, COMMISSIONING, START-UP AND TRAINING SUPERVISION